Flexible cable-supported systems
Pre-tensioned steel cables carry the modules high above the ground with very long spans. This suits agrivoltaic, fishery-PV and other elevated projects where the land below must stay in use.
| Span | Up to approx. 40 m |
|---|---|
| Piles | As few as 94 per MW |
| Tilt | Supports steeper module tilt for higher yield |
| Wind resistance | Double-cable lower layer with flared tension structure, braced front-to-back |
| Cost | 2–5 % lower investment than conventional elevated structures |


